Monday, June 2, 2014
Monday, May 5, 2014
week 5
i learned the importantence of having one of those larger shafts aligned properly because being off just a little bit can cause big problems
Monday, April 28, 2014
Volvo penta school
Wednesday, March 19, 2014
week 6
45 hrs
week 5
42
week 4
40
week 3
hours 40
Tuesday, March 18, 2014
week 2
38hrs
Wednesday, January 22, 2014
Week 1
Sorry about not posting earlier but so for week one I spent some time working on a D6 Volvo penta that a customer did the install himself but didn't install the right pcm and hcm so we swapped those out, had the starter rebuilt (it was really corroded) and new shift actuator. After that I got to gown down to Anacortes to start on installing a 343 cat in a seiner.
Hours: 43
Monday, November 11, 2013
Tuesday, October 15, 2013
Friday, September 20, 2013
tot hours for job 10 hr.
Rough runnin 7.3 idi
My uncles got a 87 f250 with the 7.3 idi with about 450000 miles on it. It was starting then running rough then it would die. It sounded like a fuel issue so I started with the fuel system. I first checked the filter and noticed that the bowl was empty so it wasnt getting any fuel I started checking the lines back I found the problem like there next to the bowl. The feed line was cracked so I changed that and the fuel filter cause it looked dirty and cleaned the bowl out also cause it looked like no one had ever cleaned it before. So that was about a 4 hour job. He also had me do the wheel bearings, and change the diff fliuds which was about anouther six hours
Tot hours 183
Thursday, September 5, 2013
Lube service
the next day after working on that gear i went down to our seiner and full lube oil service for our main engine, gear, and auxillury. the main runs 15w-40 and takes just a little bit under 10 gallons to fill along with one spin on filter which your supposed to fill before installing. i also changed the primary fuel filter on the engine and the two racor filters. They one was fairly dirty and the other wasnt too bad and drianed the bowls to check for water and found none. Then I also cleaned the crankcase breather. Next was the gear on the main. Its a twin disc 514. I did a fliud swap and filter also. All together it was about a six hour job
Tot hours 171
time total for job: 44 hours
total hours:165
Thursday, August 22, 2013
so total hours for this one was 30hrs give or take
total hours : 121 hrs.
total hours for job: 31
total hours after this: 96
Friday, August 9, 2013
while that was being done i switched to finish the autopilot on our seiner and reinstall that uni block we had worked on in class. they decided that they wanted to replace our Wagner autopilot with a new comnav system. the new comnav was 12v instead of 32v like the Wagner was. so it required a new distribution box, rudder follower, head unit, new actuators installed on the uni body, and new wires ran to the various components. it took about 4 hours to run wiring from the stern to the box in the bow for the rudder follower. then i replaced the 32v actuators(actually they were 110v solenoids on the actuators but i guess that's what they used to for 32v caused they didn't actually make 32v solenoids) on the uni block with new 12v vickers actuators and solenoids and ran 14 gauge wire from the distribution box in the top house to solenoids. and bled the system. which took about 6 hours. the next step was to wire in the rudder follower, the two rudder indictors, jog sticks, the actutors and then hook it up to the head unit and run the setup on it which took about 8 hours
total hours for job: 18 hrs
total as of 6/24/13: 65 hrs.
Tuesday, July 16, 2013
total hours for job: 47 hours.